Unit summary
- Functional requirements state what the system does, and non-functional requirements state how well.
- The SRS is the official statement of requirements and must be complete, unambiguous and verifiable.
- Requirements engineering includes feasibility study, elicitation, specification, validation and management.
- A proactive risk strategy plans before risks occur.
- Risk exposure is probability multiplied by the cost of loss.
- RMMM covers mitigation, monitoring and management of each risk.
- Pricing depends on cost and on market and contractual factors.
- Scheduling uses a work breakdown structure, a Gantt chart and the critical path.
- Agile planning is incremental, and velocity forecasts the work.
- COCOMO and function points estimate effort and size.
Glossary
| Term | Meaning |
|---|---|
| COCOMO | An algorithmic model that estimates effort from size. |
| Contingency plan | Actions to take if a risk occurs. |
| Critical path | The longest path in a task network. |
| Elicitation | Discovering requirements from stakeholders. |
| Function point | A measure of software size based on user-visible functions. |
| Functional requirement | A statement of what the system must do. |
| Gantt chart | A bar chart of tasks against time. |
| Milestone | A checkpoint at which progress is measured. |
| Mitigation | Reducing the probability or impact of a risk. |
| Non-functional requirement | A constraint on how the system performs its services. |
| Requirement | A statement of a service or constraint on a system. |
| Risk | A potential problem that would cause loss if it occurred. |
| Risk exposure | Probability of a risk multiplied by the cost of its loss. |
| RMMM | Risk mitigation, monitoring and management. |
| Slack | Spare time of a task off the critical path. |
| SRS | The software requirements specification document. |
| Story point | A unit of the relative size of a user story. |
| Traceability | The ability to follow a requirement through design and testing. |
| Validation | Checking that requirements are what the customer wants. |
| Velocity | Story points completed per iteration. |
Question bank
Short Answer Questions (2 marks each)
- Distinguish functional and non-functional requirements.
- What is an SRS?
- What is requirements elicitation?
- Name two requirements validation techniques.
- What is a proactive risk strategy?
- How is risk exposure calculated?
- What does RMMM stand for?
- What is a milestone?
- What is the critical path?
- What is velocity in agile planning?
Medium Answer Questions (5 marks each)
- Explain functional and non-functional requirements with examples.
- Describe the contents and qualities of an SRS.
- Explain requirements elicitation and analysis.
- Explain requirements validation and management.
- Distinguish reactive and proactive risk strategies.
- Explain risk projection and risk refinement.
Long Answer Questions (15 marks each)
- Explain the requirements engineering process in detail.
- Explain software risks and the steps of risk identification, projection and refinement, with an example of computing risk exposure.
- Explain the RMMM plan with an example, and the risk information sheet.
- Explain software pricing, project scheduling and the critical path, and the estimation techniques, including Basic COCOMO. Estimate the effort for an organic project of 20 KLOC.