Unit summary

  • Software is programs, data and documentation, and it deteriorates rather than wears out.
  • The software crisis led to the discipline of software engineering.
  • The approach has process, methods, tools and a focus on quality, guided by principles such as abstraction and decomposition.
  • Waterfall suits stable requirements, prototype suits unclear requirements and iterative enhancement grows the system in steps.
  • Time boxing, spiral, RAD and object-oriented models address delivery time, risk and reuse.
  • Project management covers planning, costing, scheduling, monitoring and reporting.
  • Scheduling uses the WBS, Gantt and PERT charts, and the critical path fixes the project duration.
  • Risk management identifies, analyses, plans for and monitors risks, and ranks them by exposure.

Glossary

Term Meaning
Abstraction Concentrating on the essential and hiding detail.
Contingency plan A plan of action if a risk occurs.
Critical path The longest path through the task network.
Decomposition Splitting a problem into smaller parts.
Iterative enhancement Growing a system in steps from a simple version.
Object-oriented model A model built around classes and reuse.
PERT A technique that uses three time estimates per task.
Process model A simplified description of a software process.
Project plan A document of the activities, resources and schedule.
Prototype A working sample used to clarify requirements.
RAD A fast, component-based development model.
Risk A possible future problem that would cause loss.
Risk exposure Probability of a risk multiplied by its loss.
Software Programs, data and documentation.
Software crisis The set of problems of late, costly and poor quality software.
Software engineering A systematic, disciplined approach to building software.
Spiral model A risk-driven process model.
Time boxing Fixed-duration iterations with adjustable scope.
Waterfall model A linear, phase-by-phase process model.
WBS A breakdown of a project into tasks.

Question bank

Short Answer Questions (2 marks each)

  1. Define software and list its characteristics.
  2. What is the software crisis?
  3. State four principles of software engineering.
  4. What is a process model?
  5. State two disadvantages of the waterfall model.
  6. What is a time box?
  7. What is RAD?
  8. What is a work breakdown structure?
  9. What is the critical path?
  10. Define risk exposure.

Medium Answer Questions (5 marks each)

  1. Explain the characteristics of software and the software crisis.
  2. Explain the principles and challenges of software engineering.
  3. Explain the waterfall model with its merits and demerits.
  4. Explain the prototype and iterative enhancement models.
  5. Explain the spiral model.
  6. Explain the activities of risk management.

Long Answer Questions (15 marks each)

  1. Explain the software crisis, the software engineering approach and its principles.
  2. Explain the waterfall, prototype and iterative enhancement models and compare them.
  3. Explain the time boxing, spiral, RAD and object-oriented models with a comparison.
  4. Explain the activities of software project management, including planning, scheduling with PERT and the critical path, and risk management.

Sources

  • Official BCA syllabus Advanced Software Engineering, course code 25BCA405DS01, Unit I